/60
3
CPE - close report window

Report a question

You cannot submit an empty report. Please add some details.
CPE - tail spin

 

 

 

 


Florida General Project Management Exam - PRIVATE

Ready to take the next step toward becoming a licensed General Contractor in Florida? Your journey to success starts here! This is a free test that you can dive into a comprehensive 3-hour, 60-question practice test designed specifically for the Florida General Project Management Exam. This timed test is your perfect opportunity to sharpen your skills, identify areas for improvement, and build the confidence you need to ace the real exam.

Your Florida General Project Management Practice Exam

Ready to demonstrate your project management expertise? As a valued member, you've unlocked access to this comprehensive practice environment that mirrors the actual certification exam experience.

Your Exclusive Practice Session:

Drawing from our robust bank of over 180 professionally crafted questions, this free practice exam challenges you with 60 carefully selected questions in a 180-minute timeframe. This is your opportunity to experience the real exam format in a pressure-free environment.

Strategic Success Tip:

Maximize your performance using our bookmark feature. When you encounter a complex question, flag it and continue – this time-tested approach helps you maintain momentum and optimize your score. You can return to challenging questions once you've tackled the more straightforward ones.

What Makes This Practice Test Valuable:

Questions drawn from our extensive 180+ question bank

Full 180-minute time frame matches actual exam conditions

Professional-grade questions cover all key project management domains

Bookmark feature helps you develop effective test-taking strategies

Detailed feedback helps identify your strengths and areas for improvement

Ready to assess your project management knowledge? Click "Start" below to begin your practice exam.

Remember: This is your opportunity to gauge your readiness in a realistic testing environment. Let's make it count!

 

Please enter the password you were given.  
CPE - quiz maker eye visibility offCPE - quiz maker eye visibility

The number of attempts remaining is 3

Please enter your following information to get started:

 

1 / 60

CPE - bookmark empty

The building permit, or a copy of the permit, shall be kept ______ until completion of the project.

2 / 60

CPE - bookmark empty

Which of the following are a contractor and subcontractor asked to submit for a project?

3 / 60

CPE - bookmark empty

Which of the following is not a standard structural steel bolt?

4 / 60

CPE - bookmark empty

What are the three principal methods of removing intercepted groundwater?

5 / 60

CPE - bookmark empty

Minimum size restraint/bracing material is  ________ stress grade lumber unless another size is specified by the building designer.

6 / 60

CPE - bookmark empty

Fuel gas cylinders must be equipped with shutoff valves and _________________.

7 / 60

CPE - bookmark empty

A fully planked or decked floor or nets shall be maintained within two stories or _____ feet whichever is less , directly under any erection work being performed.

8 / 60

CPE - bookmark empty

Where a lifeline is subject to cutting or abrasion it shall be a minimum of manila rope.

9 / 60

CPE - bookmark empty

The approximate out-of-plane tolerance for a 20'long truss is _______.

10 / 60

CPE - bookmark empty

In what type of construction are timber footings allowed to be used?

11 / 60

CPE - bookmark empty

A contractor has to select one of four different materials to use for insulation. _____will provide the best insulation.

12 / 60

CPE - bookmark empty

Location of floor furnaces shall conform to which of the following requirements?

13 / 60

CPE - bookmark empty

What is the diagonal of a rectangle, 45' x 85'?

14 / 60

CPE - bookmark empty

A subcontractor's work is substantially complete and in accordance with the requirements of the prime contract. The contractor received application for payment from the subcontractor and made prompt application for payment to the architect for such work. The architect issued application for payment covering such work. According to AIA Document A401, the contractor shall pay the subcontractor within ____ days after the issuance of the certificate for payment by the architect.

 

 

15 / 60

CPE - bookmark empty

What is stamped on construction documents after they have been reviewed by the building department?

16 / 60

CPE - bookmark empty

Electric heat pumps shall ________.

17 / 60

CPE - bookmark empty

Pool lifts shall be located where the water level does not exceed _________  inches.

18 / 60

CPE - bookmark empty

Who is responsible for assuring that the work is accessible and exposed for inspection purposes?

19 / 60

CPE - bookmark empty

Diagonal Bracing is critical in preventing trusses from leaning or _________.

20 / 60

CPE - bookmark empty

During construction the ____ will provide the administration of the contract as described in the contract documents and will be the owner's representative.

21 / 60

CPE - bookmark empty

The contractor shall keep the premises and surrounding area of a construction site free of which of the following?

22 / 60

CPE - bookmark empty

A temporary structure is required to have a permit when it is designed to hold at least 10 occupants and have a square footage in excess of ______.

23 / 60

CPE - bookmark empty

What do the terms CPM and PERT pertain to?

24 / 60

CPE - bookmark empty

Which of the following buildings would be classified as an A-2 occupancy?

25 / 60

CPE - bookmark empty

An infrared radiant heater shall be fixed in a position separate from ______ supply lines.

26 / 60

CPE - bookmark empty

The contractor shall keep the premises and surrounding of a construction area free of which of the following?

27 / 60

CPE - bookmark empty

What is the net cross-sectional area of a rectangular chimney flue that is 12" x 16"?

28 / 60

CPE - bookmark empty

A short-term project schedule is a detailed explanation of the next four weeks of construction activities and should be reviewed by all of the following except:

29 / 60

CPE - bookmark empty

Who may order the Subcontractor to make changes in the work (within the general scope of the subcontract agreement) without invalidating the subcontract agreement?

30 / 60

CPE - bookmark empty

According to AIA 201all permits, governmental fees and licenses necessary for the proper execution in the completion of a project shall be secured by the_____________.

31 / 60

CPE - bookmark empty

A stairway, ladder, ______or other safe means of egress shall be in trench excavation that are 4 feet or more in the depth to require no more than 25 feet of lateral travel.

32 / 60

CPE - bookmark empty

What type of construction is classified as heavy timber?

33 / 60

CPE - bookmark empty

What is the MINIMUM design live load for the entire length of a pedestrian covered walkway?

34 / 60

CPE - bookmark empty

A total payment of$550 is made towards a complete invoice amount of $7,423. What is the total percentage of the payment made?

35 / 60

CPE - bookmark empty

In a building that requires a fire command center, the walls shall be of I-hour fire barrier construction with a MINIMUM dimension of 10 feet and a MINIMUM square footage of _________.

36 / 60

CPE - bookmark empty

______is not a satisfactory glue to be used when the laminated member will be continuously immersed in water.

37 / 60

CPE - bookmark empty

A construction job will require a trench for PVC pipe 3' wide, 3' deep and 250yards long. Because of accessibility issues, the trench must be hand excavated. The soil is sandy loam. The job must be completed in 2 regular workdays (8 hours per person per day). The labor cost, per man, per whole day, is $110. The trench, by municipal code, must have yellow florescent tape around the entire perimeter of
the trench after normal working hours. What will the cost of manpower be? (Laborers only, no partial day payments).

38 / 60

CPE - bookmark empty

One way, according to the Florida Construction Lien Law, an owner can minimize duties is for the owner to ________.

39 / 60

CPE - bookmark empty

A commercial cooking fire extinguishing system shall have a manual actuation switch located not more than what?

40 / 60

CPE - bookmark empty

When renting non-tractor equipment, who is usually responsible for the cost of repairs due to normal wear and tear?

41 / 60

CPE - bookmark empty

The overall time framework for receiving submittals is defined by which of the following?

42 / 60

CPE - bookmark empty

Thicker plywood may be bend by cutting ______across the inner face at right angles to the curve.

43 / 60

CPE - bookmark empty

The limited Access zone shall be equal to the height of the wall to be constructed plus 4 feet and _____________________.

44 / 60

CPE - bookmark empty

Who is responsible for assuring that the work is accessible and exposed for inspection purposes?

45 / 60

CPE - bookmark empty

Do not remove Ground Bracing until all the Top Chord, Web, and Bottom Chord Restraints and Braces are installed for _____________________.

46 / 60

CPE - bookmark empty

What is the maximum slope for a type B soil for an excavation less than 20' in depth?

47 / 60

CPE - bookmark empty

Used materials may be utilized under which of the following conditions?

48 / 60

CPE - bookmark empty

The purpose of the contractor reviewing the Drawings is not to:

49 / 60

CPE - bookmark empty

Long length Continuous top chord temporary lateral restraints shall have diagonal braces at maximum of how many feet?

50 / 60

CPE - bookmark empty

Which of the following is not one of the ways heat transfers through windows and skylights?

51 / 60

CPE - bookmark empty

An encumbrance that usually makes real or personal property the security for payment of debt or discharge of an obligation Is known to be which of the following?

52 / 60

CPE - bookmark empty

Which of the two following types of mortar which conform to ASTM C270 can be used on glass unit masonry construction?

53 / 60

CPE - bookmark empty

Florida vertical accessibility requires _____ level(s) in all new buildings, structures and facilities and all altered areas of existing buildings, structures and facilities to be accessible to persons with disabilities.

54 / 60

CPE - bookmark empty

For a 40' span scissor truss with 5/12 slope and a pitch difference of 3, would require top chord lateral bracing spaced at _____.

55 / 60

CPE - bookmark empty

The outer jacket of a flexible duct section _________ be interposed between the flange of the duct collar fitting and the flexible duct.

56 / 60

CPE - bookmark empty

The ____ shall be exclusively accountable for and have control over construction means, methods, techniques, sequences and procedures, and for coordinating all portions of the work under the contract.

57 / 60

CPE - bookmark empty

According to AIA 201, when a project is complete, who owns the plans?

58 / 60

CPE - bookmark empty

If an easement is to be secured for construction access, according to AIA 201, the __________secures and pays for it.

59 / 60

CPE - bookmark empty

Low-e windows designed for hot climates are called:

60 / 60

CPE - bookmark empty

Which of the following is not a form in which sunlight reaches a building

Your score is