Walker's, Building Estimator's Reference Book Practice Exam

Estimate with confidence, pass with ease. Master Walker's Builders Estimator Reference Guide and pave your way to licensure with our expert-designed supplemental exam

Exam Details

Time Limit
75 minutes
Questions
25 randomly selected
Question Bank
100 unique questions

Test-Taking Tips

Use your time wisely - Just under 3 minutes per question
Not sure about an answer? Use the bookmark feature to flag questions for review
Cost per attempt: Unlimited free attempts for ad-supported exams.
Format: Feel free to use notes or other resources for this exam. Your state may vary if it is open or closed book

Take a deep breath, get comfortable, and click "Start" when you're ready to begin. Good luck!

Study Smart!

Each fresh attempt gives you:

New question combinations

Simulates actual exam conditions and timing

Good luck with your practice test!

Please enter your following information to get started:

1 / 25

CPE - bookmark empty

Architects and Engineers specify that fill material is to be placed in layers from ___________ inches and to compact each layer with some sort of roller or tamping equipment.

2 / 25

CPE - bookmark empty

The federal government, under the _________ , requires that a contractor furnish two separate bonds, one for performance and one for the payment of labor and materials.

3 / 25

CPE - bookmark empty

A vertical plane represented by an orthographic projection of the outside building is a (an) _________________ .

4 / 25

CPE - bookmark empty

A defect in workmanship is found 18 months after a project is completed. A ________bond would cover the repair.

5 / 25

CPE - bookmark empty

According to Walker's Estimator's Reference Book, information on the nature or the thickness of underlying rock is usually obtained by _________________ .

6 / 25

CPE - bookmark empty

A masonry unit that does not meet standards or specifications and has been rejected is known as ___________.

7 / 25

CPE - bookmark empty

The process of constructing the temporary end of a masonry wall with the end stretcher of every alternate course projecting is known as __________________ .

8 / 25

CPE - bookmark empty

When excavating sandy clay/moist loam using a hydraulic tractor (crawler) backhoe with a 1-1/4 cubic yard bucket, an average of cubic yards can be excavated per 8-hour day. Select the closest answer.

9 / 25

CPE - bookmark empty

The highest strength mortar is ______________ .

10 / 25

CPE - bookmark empty

A _________arch has horizontal or nearly horizontal upper and lower surfaces.

11 / 25

CPE - bookmark empty

Most working drawings for building construction are based on ____________.

12 / 25

CPE - bookmark empty

Vermiculite is a mineral that expands, when heated, to about ___________ times its original size

13 / 25

CPE - bookmark empty

A _____________contract allows the owner control over the selection of his general contractor.

14 / 25

CPE - bookmark empty

Modular face bricks with a nominal brick size of 2 2/3" x 4" x 8" are to be used to face a 2,500 square foot wall without headers. _________bricks will be required for this job. Select the closest answer.

15 / 25

CPE - bookmark empty

A pneumatic tamper enables a worker to do nearly ____________ times the work he can do by hand.

16 / 25

CPE - bookmark empty

The well point method of dewatering is usually ______.

17 / 25

CPE - bookmark empty

The ___________method of drilling can only be used for preliminary investigations for foundations.

18 / 25

CPE - bookmark empty

A contractor is estimating the amount of roofing material to buy for a project. According to Walker's, a  waste factor of _______________ % would be used to estimate the quantity of asphalt shingles for a structure with hip roofs, including dormers and valleys.

19 / 25

CPE - bookmark empty

According to Walker's Estimator's Reference Book, 8" light weight concrete block has an R value of _________.

20 / 25

CPE - bookmark empty

A method of construction for walls that greatly reduces the investment in large quantities of forming material is known as _______________ construction. In this method, the wall panels are cast on the ground and then raised into position.

21 / 25

CPE - bookmark empty

____________ standard bricks are required to build an ft x 20 ft wall . Select the closest answer.

22 / 25

CPE - bookmark empty

The late start of an activity is the ____________________________ .

23 / 25

CPE - bookmark empty

________ is the amount of time for an activity, obtained by subtracting its early start (ES) from its late start (LS) or early finish (EF) from its late finish (LF).

24 / 25

CPE - bookmark empty

Which one of these is not one of the three traditional methods of construction scheduling?

25 / 25

CPE - bookmark empty

According to Walker's Estimator's Reference Book, modifications issued after contract is signed are called a(n) _________________.

CPE - Results Calculated By CPE

Your score is

The average score is 33%

0%