/25
12
CPE - close report window

Report a question

You cannot submit an empty report. Please add some details.
CPE - tail spin

Walker's, Building Estimator's Reference Book Practice Exam

Estimate with confidence, pass with ease. Master Walker's Builders Estimator Reference Guide and pave your way to licensure with our expert-designed supplemental exam

Exam Details

Time Limit
75 minutes
Questions
25 randomly selected
Question Bank
100 unique questions

Test-Taking Tips

Use your time wisely - Just under 3 minutes per question
Not sure about an answer? Use the bookmark feature to flag questions for review
Cost per attempt: Unlimited free attempts for ad-supported exams.
Format: Feel free to use notes or other resources for this exam. Your state may vary if it is open or closed book

Take a deep breath, get comfortable, and click "Start" when you're ready to begin. Good luck!

Study Smart!

Each fresh attempt gives you:

New question combinations

Simulates actual exam conditions and timing

Good luck with your practice test!

Please enter your following information to get started:

1 / 25

CPE - bookmark empty

Which of the following is NOT an advantage of renting or leasing construction equipment?

2 / 25

CPE - bookmark empty

According to Walker's Estimator's Reference Book, modifications issued after contract is signed are called a(n) _________________.

3 / 25

CPE - bookmark empty

The late start of an activity is the ____________________________ .

4 / 25

CPE - bookmark empty

Money set aside to replace future equipment should be put into a separate fund know as a(an) __________ fund.

5 / 25

CPE - bookmark empty

The ___________method of drilling can only be used for preliminary investigations for foundations.

6 / 25

CPE - bookmark empty

Construction drawings will generally depict details through the use of _______________.

7 / 25

CPE - bookmark empty

The type of mortar recommended to be used for stone foundation walls is _________________________ .

8 / 25

CPE - bookmark empty

In estimating quantities of excavation and concrete, both are measured by the cubic yard. One cubic yard contains _______ cubic feet.

9 / 25

CPE - bookmark empty

If an ASTM standard reinforcing bar has a diameter of 1.00 inch, then it would be classified a _______ bar.

10 / 25

CPE - bookmark empty

A contractor has to excavate a drainage swale that is 200' long, 16' wide and has a depth of 2' with the ends vertical. If the soil to be removed is mud, the total volume of material to be removed from the job site would be _____________ cyd. Select the closest answer

11 / 25

CPE - bookmark empty

Any discrepancies on the plans or specifications or changes the architect or owner wish to make after the plans and specifications have been issued, but before bids are turned in, are incorporated in the ____________ .

12 / 25

CPE - bookmark empty

An activity with zero float is called a _______.

13 / 25

CPE - bookmark empty

Which one of these is not one of the three traditional methods of construction scheduling?

14 / 25

CPE - bookmark empty

An AIA form __________ is used to furnish information needed to bid on public work.

15 / 25

CPE - bookmark empty

One mason will lay approximately _________ 8" concrete blocks in an 8-hour shift.

16 / 25

CPE - bookmark empty

If the lap is 4" wide and only a single thickness of felt is used, add about ___________ % to allow for laps and the additional felt required at the top and bottom of wall.

17 / 25

CPE - bookmark empty

The type of excavating equipment selected, as well as the size of the equipment required for a project, should be based on the ______________.

18 / 25

CPE - bookmark empty

____________work is usually publicly advertised.

19 / 25

CPE - bookmark empty

_____________are drawings in which all horizontal and vertical lines have true length and vertical lines are vertical but horizontal lines are set at 30 degrees or -30 degrees.

20 / 25

CPE - bookmark empty

The area of a roof measuring 10 - - with a ¼ pitch and is ________ square feet. Select the closest answer.

21 / 25

CPE - bookmark empty

The maximum distance that can typically be spanned by a wood truss is _______________ ft.

22 / 25

CPE - bookmark empty

The principal objective of construction scheduling is to manage all of the following resources used in the construction process except for ______________.

23 / 25

CPE - bookmark empty

The convenience outlet symbol is defined to be a ________.

24 / 25

CPE - bookmark empty

A contractor can borrow money at 2 points above the current prime rate. This means that ___________.

25 / 25

CPE - bookmark empty

The typical dead weight of a ¾ inch piece of structural plywood is __________ lbs.